Leatherworker: Difference between revisions
Jump to navigation
Jump to search
Content added Content deleted
Hugh janus (talk | contribs) mNo edit summary |
Hugh janus (talk | contribs) (raw profit explanation) |
||
Line 15: | Line 15: | ||
Each workstation processes items at slightly varying speeds, with the fastest being the Liming Pit at 3.3 seconds per item, and the slowest being the Soaking Tub at 5 seconds per item. |
Each workstation processes items at slightly varying speeds, with the fastest being the Liming Pit at 3.3 seconds per item, and the slowest being the Soaking Tub at 5 seconds per item. |
||
Raw profit is calculated as *discounted profit - profit = value x 24* giving the total amount extra you would earn from a full inventory of profited wares |
|||
{| class="wikitable sortable" |
{| class="wikitable sortable" |
||
|+Tanning |
|+Tanning |